Supply Date15 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity34.54
Freight0
Loading Charges0
Offloading Charges0
Royalty3.4
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost2017.14
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.50
Fe1.96
SiO213.50
Al2O37.20
P0.17
Size 0-10MM2.6
Size 10-20MM2.5
Size 20-100MM24.80
Size +100MM70.10