Supply Date13 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity50.735
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost2975.61
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.95
Fe3.25
SiO215.85
Al2O37.68
P0.17
Size 0-10MM12.85
Size 10-20MM8.45
Size 20-100MM35.85
Size +100MM42.85