Supply Date11 Dec 2020
Contract NumberSAFAL/P/MN ORE/12.111/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity34.605
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost2029.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.05
Fe4.65
SiO214.15
Al2O37.28
P0.170
Size 0-10MM3.95
Size 10-20MM4.66
Size 20-100MM31.11
Size +100MM60.28