Supply Date09 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity26.58
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost1548.71
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.25
Fe3.68
SiO212.62
Al2O36.45
P0.170
Size 0-10MM8.95
Size 10-20MM7.33
Size 20-100MM30.74
Size +100MM52.98