Supply Date09 Dec 2020
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity26.545
Freight8.616
Loading Charges0
Offloading Charges0
Royalty0
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost1370.15
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.94
Fe2.05
SiO211.95
Al2O35.77
P0.165
Size 0-10MM2.45
Size 10-20MM1.98
Size 20-100MM25.27
Size +100MM70.30