| Supply Date | 07 Dec 2019 |
| Contract Number | SAFAL/P/MN ORE/1218/2019 |
| Item | Manganese Ore |
| Supplier Name | Mineswood |
| Grade (%) | High (44% - 50%) |
| Lot Number | Mineswood Minerals |
| Deviance | 0 |
| Inward Quantity | 48.08 |
| Freight | 17.93 |
| Loading Charges | 1.92 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3839.19 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |
|---|
Raw Material Test
Showing 1-6 of 6 items.
| Raw Material Component | Value |
| Mn | 42.65 |
| Fe | 1.70 |
| SiO2 | 1090 |
| Al2O3 | - |
| P | - |
| Size 0-10MM | 10-100mm |