Supply Date06 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity35.015
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost2040.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.08
Fe3.12
SiO213.68
Al2O38.24
P0.175
Size 0-10MM12.08
Size 10-20MM6.44
Size 20-100MM61.48
Size +100MM20.20