Supply Date05 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.104/2020
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity28.46
Freight0
Loading Charges0
Offloading Charges0
Royalty113.647
Other Cost41.782
Quality Deviance0
Grade Deviance0
Total Cost2391.44
Conversion Rate (Please insert 1 if no conversion is required)20.891
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn50.95
Fe2.20
SiO27.65
Al2O33.50
P0.14
Size 0-10MM2.05
Size 10-20MM1.55
Size 20-100MM49.85
Size +100MM46.55