Supply Date05 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity35.365
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost2074.16
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.85
Fe2.97
SiO214.35
Al2O38.35
P0.165
Size 0-10MM11.68
Size 10-20MM14.75
Size 20-100MM33.01
Size +100MM40.56