Supply Date05 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity35.115
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost2046.01
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn38.45
Fe3.85
SiO213.90
Al2O38.38
P0.17
Size 0-10MM08.85
Size 10-20MM13.15
Size 20-100MM40.25
Size +100MM37.75