Supply Date03 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity29.38
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost1711.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.20
Fe3.15
SiO211.05
Al2O37.75
P0.160
Size 0-10MM8.15
Size 10-20MM9.78
Size 20-100MM41.52
Size +100MM40.55