Supply Date02 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity32.595
Freight8.616
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost-7
Quality Deviance0
Grade Deviance0
Total Cost1899.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.60
Fe2.90
SiO211.60
Al2O36.20
P0.17
Size 0-10MM2.12
Size 10-20MM3.10
Size 20-100MM14.60
Size +100MM80.18