Supply Date02 Dec 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity32.53
Freight0
Loading Charges0
Offloading Charges0
Royalty3.65
Other Cost2
Quality Deviance0
Grade Deviance0
Total Cost1907.88
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.20
Fe4.90
SiO212.50
Al2O37.12
P0.17
Size 0-10MM1.20
Size 10-20MM1.50
Size 20-100MM12.18
Size +100MM85.12