Supply Date30 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity26.76
Freight8.747
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost-8
Quality Deviance0
Grade Deviance0
Total Cost1539.96
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.10
Fe1.91
SiO211.62
Al2O37.61
P0.17
Size 0-10MM1.10
Size 10-20MM1.60
Size 20-100MM19.20
Size +100MM78.10