Supply Date25 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity42.695
Freight8.747
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost-8
Quality Deviance0
Grade Deviance0
Total Cost2456.97
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.95
Fe2.90
SiO212.33
Al2O37.02
P0.155
Size 0-10MM7.95
Size 10-20MM6.42
Size 20-100MM35.68
Size +100MM49.95