Supply Date27 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity26.66
Freight8.747
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost-8
Quality Deviance0
Grade Deviance0
Total Cost1534.2
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.06
Fe2.68
SiO212.18
Al2O36.42
P0.160
Size 0-10MM3.15
Size 10-20MM3.68
Size 20-100MM12.73
Size +100MM80.44