Supply Date26 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity37.71
Freight8.747
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost-8
Quality Deviance0
Grade Deviance0
Total Cost2170.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.26
Fe2.62
SiO211.94
Al2O36.88
P0.160
Size 0-10MM2.35
Size 10-20MM3.67
Size 20-100MM20.45
Size +100MM73.52