Supply Date25 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity42.365
Freight8.747
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost-8
Quality Deviance0
Grade Deviance0
Total Cost2437.98
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.55
Fe2.95
SiO212.05
Al2O36.88
P0.16
Size 0-10MM6.42
Size 10-20MM5.94
Size 20-100MM18.88
Size +100MM68.76