Supply Date25 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.106/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity33.575
Freight0
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1940.64
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.90
Fe3.71
SiO211.85
Al2O37.25
P0.16
Size 0-10MM7.18
Size 10-20MM3.85
Size 20-100MM28.52
Size +100MM60.45