Supply Date24 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.74
Freight8.747
Loading Charges0
Offloading Charges-9
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2402.01
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.61
Fe2.81
SiO212.05
Al2O36.97
P0.16
Size 0-10MM3.81
Size 10-20MM5.62
Size 20-100MM65.02
Size +100MM25.50