Supply Date23 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity34.085
Freight0
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1970.11
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.10
Fe2.10
SiO212.50
Al2O37.05
P0.15
Size 0-10MM3.50
Size 10-20MM3.61
Size 20-100MM53.29
Size +100MM39.60