Supply Date18 Nov 2020
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity31.75
Freight8.747
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1611.22
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.2
Fe1.6
SiO210.15
Al2O37.09
P0.16
Size 0-10MM1.85
Size 10-20MM2.1
Size 20-100MM20.2
Size +100MM75.60