Supply Date22 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity37.83
Freight0
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2186.57
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.81
Fe2.60
SiO212.61
Al2O37.12
P0.15
Size 0-10MM7.61
Size 10-20MM2.10
Size 20-100MM40.69
Size +100MM49.60