Supply Date21 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity45.405
Freight8.747
Loading Charges1
Offloading Charges0
Royalty3.8
Other Cost-9
Quality Deviance0
Grade Deviance0
Total Cost2612.92
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.10
Fe2.05
SiO213.12
Al2O37.65
P0.15
Size 0-10MM3.6
Size 10-20MM7.10
Size 20-100MM49.70
Size +100MM39.60