Supply Date20 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.39
Freight8.747
Loading Charges-9
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2266.78
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.20
Fe3.10
SiO212.02
Al2O36.99
P0.15
Size 0-10MM5.2
Size 10-20MM2.10
Size 20-100MM47.50
Size +100MM45.20