Supply Date19 Nov 2020
Contract NumberSAFAL/P/MN ORE/10.92/2020
ItemManganese Ore
Supplier NameDominic M Katongo
Grade (%)High (44% - 50%)
Lot NumberDominic Katongo- Mn Ore HG
Deviance0
Inward Quantity42.755
Freight300
Loading Charges0
Offloading Charges0
Royalty78.196
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3071.25
Conversion Rate (Please insert 1 if no conversion is required)20.578
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn49.5
Fe2
SiO28.5
Al2O37.01
P0.11
Size 0-10MM5.1
Size 10-20MM4.62
Size 20-100MM83.36
Size +100MM6.92