Supply Date19 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.74
Freight8.747
Loading Charges0
Offloading Charges-9
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2517.11
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-18 of 18 items.
Raw Material ComponentValue
Mn39.8
Fe3.6
SiO213.5
Al2O37.1
P0.16
Size 0-10MM3.1
Size 10-20MM2.5
Size 20-100MM59.4
Size +100MM35
Mn39.8
Fe3.6
SiO213.5
Al2O37.1
P0.16
Size 0-10MM3.1
Size 10-20MM2.5
Size 20-100MM59.4
Size +100MM35