Supply Date18 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity38.06
Freight8.747
Loading Charges0
Offloading Charges-9
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2190.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.2
Fe2.6
SiO212.5
Al2O37.62
P0.15
Size 0-10MM2.5
Size 10-20MM3.8
Size 20-100MM45.6
Size +100MM48.1