Supply Date31 Oct 2019
Contract NumberOS/MN ORE/19/2019
ItemManganese Ore
Supplier NameEnock Kapalu Nyundu-Mn ore
Grade (%)High (44% - 50%)
Lot NumberEnock Kapalu Nyundu- Mn Ore
Deviance0
Inward Quantity6.864
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost448.84
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn29.61
Fe18.45
SiO213.43
Al2O35.3
P0.23
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-