Supply Date17 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.685
Freight8.747
Loading Charges0
Offloading Charges-9
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2341.3
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn41.59
Fe3.55
SiO212.68
Al2O36.85
P0.160
Size 0-10MM4.68
Size 10-20MM6.45
Size 20-100MM18.62
Size +100MM70.25