Supply Date14 Nov 2020
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity26.325
Freight8.747
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1335.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.15
Fe2.62
SiO210.95
Al2O36.45
P0.15
Size 0-10MM1.08
Size 10-20MM1.59
Size 20-100MM10.55
Size +100MM86.78