Supply Date12 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity33.815
Freight0
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1954.51
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-18 of 18 items.
Raw Material ComponentValue
Mn40.68
Fe2.44
SiO212.82
Al2O37.24
P0.16
Size 0-10MM5.08
Size 10-20MM3.25
Size 20-100MM30.68
Size +100MM60.99
Mn40.68
Fe2.44
SiO212.82
Al2O37.24
P0.16
Size 0-10MM5.08
Size 10-20MM3.25
Size 20-100MM30.68
Size +100MM60.99