Supply Date12 Nov 2020
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity35.63
Freight8.747
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1808.12
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.50
Fe1.20
SiO211.10
Al2O36.95
P0.15
Size 0-10MM1.10
Size 10-20MM0.90
Size 20-100MM5.10
Size +100MM92.90