Supply Date07 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity36.635
Freight0
Loading Charges1
Offloading Charges0
Royalty3.8
Other Cost-9
Quality Deviance0
Grade Deviance0
Total Cost1787.79
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-18 of 18 items.
Raw Material ComponentValue
Mn41.10
Fe3.32
SiO212.05
Al2O36.42
P0.155
Size 0-10MM6.35
Size 10-20MM3.84
Size 20-100MM19.35
Size +100MM70.46
Mn41.10
Fe3.32
SiO212.05
Al2O36.42
P0.155
Size 0-10MM6.35
Size 10-20MM3.84
Size 20-100MM19.35
Size +100MM70.46