Supply Date07 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity31.605
Freight8.747
Loading Charges1
Offloading Charges0
Royalty3.8
Other Cost-9
Quality Deviance0
Grade Deviance0
Total Cost1818.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn33.25
Fe3.94
SiO215.28
Al2O39.77
P0.16
Size 0-10MM16.85
Size 10-20MM15.77
Size 20-100MM67.38
Size +100MM0