Supply Date05 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity33.985
Freight8.747
Loading Charges1
Offloading Charges0
Royalty3.8
Other Cost-9
Quality Deviance0
Grade Deviance0
Total Cost1955.73
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.74
Fe3.83
SiO211.95
Al2O37.44
P0.17
Size 0-10MM7.99
Size 10-20MM5.74
Size 20-100MM17.05
Size +100MM69.22