Supply Date04 Nov 2020
Contract NumberSAFAL/P/MN ORE/11.103/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity38.885
Freight0
Loading Charges0
Offloading Charges0
Royalty3.8
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2247.55
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.65
Fe4.03
SiO211.44
Al2O37.18
P0.17
Size 0-10MM6.08
Size 10-20MM4.02
Size 20-100MM18.95
Size +100MM70.95