Supply Date31 Oct 2020
Contract NumberSAFAL/P/MN ORE/10.99/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity34.66
Freight0
Loading Charges0
Offloading Charges0
Royalty4.17
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1981.51
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn42.50
Fe2..16
SiO29.35
Al2O37.43
P0.155
Size 0-10MM2.85
Size 10-20MM2.64
Size 20-100MM20.44
Size +100MM74.07