Supply Date30 Oct 2020
Contract NumberSAFAL/P/MN ORE/10.99/2020
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.11
Freight0
Loading Charges0
Offloading Charges0
Royalty4.17
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2293.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.20
Fe3.10
SiO211.12
Al2O36.71
P0.15
Size 0-10MM3.10
Size 10-20MM2.50
Size 20-100MM16.30
Size +100MM78.10