Supply Date20 Oct 2020
Contract NumberSAFAL/P/MN ORE/10.94/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Big Stone MG
Deviance0
Inward Quantity31.935
Freight9.03
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1629.64
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn43.70
Fe1.90
SiO210.24
Al2O35.10
P0.15
Size 0-10MM1.2
Size 10-20MM2.1
Size 20-100MM6.10
Size +100MM90.60