Supply Date22 Oct 2020
Contract NumberSAFAL/P/MN ORE/07.63/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine (36-38%) 2
Deviance0
Inward Quantity33.545
Freight9.03
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-5
Quality Deviance0
Grade Deviance0
Total Cost1476.99
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn33.15
Fe4.45
SiO214.71
Al2O39.30
P0.17
Size 0-10MM12.15
Size 10-20MM17.33
Size 20-100MM70.52
Size +100MM-