Supply Date05 Oct 2020
Contract NumberSAFAL/P/MN ORE/10.93/2020
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberGenesis Procurement- Mn Ore HG
Deviance0
Inward Quantity35.475
Freight421.21
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2751.53
Conversion Rate (Please insert 1 if no conversion is required)19.935
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn48.81
Fe1.62
SiO26.20
Al2O31.59
P0.10
Size 0-10MM1.50
Size 10-20MM1.20
Size 20-100MM86.50
Size +100MM10.80