Supply Date02 Oct 2020
Contract NumberSAFAL/P/MN ORE/07.63/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine (36-38%) 2
Deviance0
Inward Quantity25.495
Freight9.03
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-2
Quality Deviance0
Grade Deviance0
Total Cost1199.03
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn34.10
Fe5.10
SiO213.61
Al2O37.72
P0.16
Size 0-10MM18.55
Size 10-20MM24.77
Size 20-100MM56.68
Size +100MM0