Supply Date22 Sep 2020
Contract NumberSAFAL/P/MN ORE/07.62/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity31.92
Freight8.81
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-2
Quality Deviance0
Grade Deviance0
Total Cost1653.78
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.85
Fe4.11
SiO212.55
Al2O37.04
P0.16
Size 0-10MM8.85
Size 10-20MM7.21
Size 20-100MM77.72
Size +100MM6.22