Supply Date14 Sep 2020
Contract NumberSAFAL/P/MN ORE/09.77/2020
ItemManganese Ore
Supplier NameStrong Concrete & Roofing Co Ltd
Grade (%)Medium (38% - 44%)
Lot NumberStrong Concrete & Roofing - Mn Ore
Deviance0
Inward Quantity44.6
Freight10.46
Loading Charges0
Offloading Charges0
Royalty3.44
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2671.54
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn39.80
Fe3.95
SiO212.68
Al2O35.15
P0.16
Size 0-10MM7.33
Size 10-20MM5.28
Size 20-100MM87.39
Size +100MM-