Supply Date09 Sep 2020
Contract NumberSAFAL/P/MN ORE/08.67/2020
ItemManganese Ore
Supplier NameStrong Concrete & Roofing Co Ltd
Grade (%)Medium (38% - 44%)
Lot NumberStrong Concrete & Roofing - Mn Ore
Deviance0
Inward Quantity39.36
Freight10.46
Loading Charges0
Offloading Charges0
Royalty3.44
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2357.66
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.30
Fe4.83
SiO210.12
Al2O34.12
P0.165
Size 0-10MM5.75
Size 10-20MM7.22
Size 20-100MM87.03
Size +100MM-