SAFAL/P/MANGANESE ORE/10/2023/46


Contract NumberSAFAL/P/MANGANESE ORE/10/2023/46
Contract Date03 Oct 2023
TypePurchase
Supplier NameAMIZO POWER ENGINEERS LTD
Description of Goods Manganese Ore
GradeHigh (44% - 50%)
Size10-90MM(MIN 90%)
Specifications1 SPECIFICATIONS REQUIREMENT- MN 53.38 % MIN. PHOSHPHORUS SHOULD BE LESS THAN 0.044% ,SILICA SHOULD BE MAX 3.50%,FE 1.66 % MAX AND AL203 % SHOULD BE LESS THAN 3.60 %. 2 ALL SPECIFICATIONS AS PER ANALYSIS REPORT REF MSKTZ/ROSA/00437/23-24 TESTING REPORT PROVIDED BY AMIZO COMPANY.
Quantity1000
Weight UnitMetric Tonne
DestinationSAFAL PLANT KANONA
Rate95
CurrencyUS Dollar
VAT %16
Mode/Terms of PaymentUpon delivery at SAFAL plant and testing of the material
Terms of DeliveryEX MINE MATERIAL LOADED ON TRUCKS.
Delivery PeriodOCTOBER 2023
Dispatch ThroughBUYER HIRED TRUCKS
Lot NumberAmizo Power Mn ore FY 23
Remark1 ALL TRUCKS SHOULD ACCOMPANY MINING LICENCE COPY,COUNCIL RECEIPTS AND MANGANESE CLERANCE. 2 DOCUMENTS CHARGES LIKE WEIGHBRIDGE COST,COUNCIL FEES COST AND TRUCK LEVY WILL BE PAID BY SAFAL IN MANSA.
Other Reference(s)PRICE IS INCLUDING MRT.CERTIFICATE TO BE PROVIDED EVERY MONTH END BY THE SUPPLIER.
Showing 1-14 of 14 items.
#Supply DateSupplier NameItemGrade (%)Inward Quantity
105 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)45.8
205 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)46.32
310 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)47.86
410 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)38.16
510 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)44.24
612 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)43.08
713 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)43.22
816 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)47.32
921 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)42.38
1024 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)43.68
1127 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)42.44
1230 Oct 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)48.74
1301 Nov 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)44.74
1407 Nov 2023AMIZO POWER ENGINEERS LTDManganese OreHigh (44% - 50%)47.14

Total Supply: 625.12