Supply Date22 Aug 2020
Contract NumberSAFAL/P/MN ORE/07.62/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity31.33
Freight8.81
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1685.87
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.89
Fe3.92
SiO212.54
Al2O35.68
P0.16
Size 0-10MM10.35
Size 10-20MM18.68
Size 20-100MM66.65
Size +100MM4.32