Supply Date31 Oct 2019
Contract NumberOS/MN ORE/10/2019
ItemManganese Ore
Supplier NamePeniel Mines Limited
Grade (%)Ultra Low (Below 32%)
Lot NumberPeniel Mining Mn Ore <30%
Deviance0
Inward Quantity160.758
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4172.64
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn30.5
Fe14.5
SiO29.6
Al2O35.5
P0.24
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-