Supply Date13 Aug 2020
Contract NumberSAFAL/P/MN ORE/07.62/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine MG Lumpy 2
Deviance0
Inward Quantity34.68
Freight7.6
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1824.17
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn37.10
Fe4.02
SiO210.85
Al2O37.32
P0.17
Size 0-10MM7.38
Size 10-20MM12.35
Size 20-100MM71.33
Size +100MM8.94